1. Project title: Wastewater treatment plant in the south

2. Location: Southern part of Kish Island

3. The Project:
Based on the Water and Wastewater Master Plan for the island, two wastewater treatmentplants have been predicted for Kish. One of these plants is located in the north while theother one is placed in the south of the island. According to studies done by consultants at thezero phase, the plant capacity intended for the 1405 Horizon is 15,000 cubic meters per day,for 60.000 population.
4.
Annual Capacity: 5000 Cubic Meters per day for each Phase
5. Total Area:
3500 Square Meters
6.
Constructed Area: No
7.
Project Construction period: Three Years ( Phase 1)
8.
Costs: 400 billion Rials.
9. Access to infrastructures

NO Required infrastructure Distance to project site
1 Water on the project site
2 Power  on the project site
3 Tele-communication on the project site
4 Main Road On Project Site
5 Airport 10 Kilometers
6 Harbor 15 Kms



10 - Investment methods

A: Partnership* B: contracting C: Absolute purchase of land D:Rent land