1. Project title: New Domestic and International Terminals and Power Room for Kish Airport

2. Location: Kish International Airport

3. The Project:
The building for new passenger terminal at Kish Airport is 41,822 M2 and comprises publicareas, customs (departure and arrival), corridors, passport control, restaurants etc. Besides,the power room(1865 M2) and its passage to connect it to the terminal main building,landscaping have been designed according to the latest world architecture and airporttechnology. The designs have been localized to preserve the cultural and Islamic bases.
4. Annual Capacity:
4.4 Million
5.
Total Area: 90000 M2
6.
Constructed Area: 41822 M2
7.
Project Construction period: 5/2 year
8.
Costs: 3500 million IRRs
9. Access to infrastructures

NO Required infrastructure Distance to project site
1 Water on the project site
2 Power  on the project site
3 Tele-communication on the project site
4 Main Road YES
5 Airport On Project Site
6 Harbor 7/2 Kms



10 - Investment methods

A: Partnership *  B: contracting * C: Absolute purchase of land  D:Rent