Fuel Depot

1. Project title:

2. Location:

3. The Project:
• Designing and constructing fuel depot in proximity of Kish Airport to increase the fuel  storage capacity  • Constructing 4 storage tanks (100 M3)-Buying and installing different pumps and filtersfor dumping of and pumping fuel to airplanes. - Building electricity,control and security posts,installing fire protection systems and landscaping
One of the advantages of this project is the increased storage capacity of ATK for airplanes
4. Annual Capacity:
Million people
5.
Total Area: 40000 M2
6.
Constructed Area: 2000 M2
7.
Project Construction period: 2 year
8.
Costs: 160 million IRRs
9. Access to infrastructures

NO Required infrastructure Distance to project site
1 Water on the project site
2 Power  on the project site
3 Tele-communication on the project site
4 Main Road YES
5 Airport On Project Site
6 Harbor 13 Kms



10 - Investment methods

A: Partnership *  B: contracting * C: Absolute purchase of land  D:Rent