Tourism Train

1. Project title: Constructing a Road and launching a tourist train

2. Location: South of the Island

3. The Project:
The project is to construct a rail line for tourist train. The route begins in the village of Hoorin the West of Island and crosses the lighthouse, the symbol of the Island’s cultural district,the Greek ship, Baghoo Village, The dream city of Padideh, Health Town, Deer Park, Water
Park and the coastal village and ends in the Dolphin Park. It also returns the way back. Theentire route is 17 km long and has 3 stop stations and will stop in each for 15 minutes. Fiveelectric locomotives will be active in this line each of which has a maximum capacity of 60
people. The wagons speed up to 50 km per hour and travel the way, including the stops,during 90 minutes. At each station various amenities are considered for tourists such as
coffee shops and restaurants, shops and health services.
4. Annual Capacity:
730 people
5.
Total Area of the amenities buildings: 5000 sm2
6.
Constructed Area: 3100 sm2
7.
Estimated fixed capital: 608 billion Rials
8.
Estimated working capital: 3 billion Rials
9. Access to infrastructures

NO Required infrastructure Distance to project site
1 Water on the project site
2 Power  on the project site
3 Tele-communication on the project site
4 Main Road on the project site
5 Airport 4 Kilometers
6 Harbor 10 Kilometers



10 - Investment methods

A: Partnership *  B: contracting*  C: Absolute purchase of land  D:Rent