Developinging Kish Commercial Port

1. Project title: The Second Phase of Kish Commercial Port Development and Constructing a -35,000ton Container Terminal

2. Location: Kish Commercial Port

3. The Project:
• Supplying, transporting and driving metal piles (9900 tons)
• Drilling and installing 3870 M3 piles, gaskets
• Suppling 320 tons cable to be pre-weaved and used
• 400-ton rebar typing
• 7200 M3 concreting for beams on main piles, tie beams and under-rail beams
• constructing concrete blocks for surfacing 18,000 M2
• Draft: 12.5 ms
4. Annual Capacity:
Changes seasonally
5.
Total Area: 12,000 M2
6.
Constructed Area: No
7. Project Completion period:
5/2 year
8. Costs:
817 million IRRs
9. Access to infrastructures

NO Required infrastructure Distance to project site
1 Water On Project Site
2 Power  On Project Site
3 Tele-communication On Project Site
4 Main Road On Project Site
5 Airport 13 Kms
6 Harbor On Project Site



10 - Investment methods

A: Partnership *  B: contracting * C: Absolute purchase of land  D:Rent