Airport,s South Runway
1. Project title: Extensive Renovation and Restoration and surface water drainage for Kish International Airport's South Runway.
2. Location: Kish International Airport
3. The Project:
The project was set up because of the extensive damage to the surface of the SouthRunway, planning for and studying of extensive renovation and restoration and surfacewater drainage-South Runway- stopways, Taxi ways, holding aprons to improve navigationsystem and runway lighting.
4. Annual Capacity: 7.2 million passenger and 23250 flights
5. Total Area: 1,200,000 M2
6. Constructed Area: No
7. Project Completion period: 15 Months
8. Costs: 340 million IRRs
9. Access to infrastructures
NO | Required infrastructure | Distance to project site |
1 | Water | on the project site |
2 | Power | on the project site |
3 | Tele-communication | on the project site |
4 | Main Road | YES |
5 | Airport | On Project Site |
6 | Harbor | 13 Kms |
10 - Investment methods
A: Partnership * B: contracting * C: Absolute purchase of land D:Rent