Establishment of an over distribution station in Nakhlstan

1. Project title: Establishment of an over distribution station in Nakhlstan

2. Location: Northwest Territories , south and southeast of the island

3. The Project:
The present plan is pertained to the distribution post in the south of the island calledNakhlestan (palm trees) aiming at constructing 132 kV cable ring posts annexed toMirmohanna and Sadaf posts. Due to the lack of energy transfer feasibility to the rest ofthe island away from the plant, at the high amount relying on the medium voltage networks,
studies which were done and calculations made led to the development the networknumber 132 and the establishment of four GIS 20/132 posts in the island. At present threeof the four devices are actively functioning accompanied by the cable network number 132.Establishment of the fourth post (Nakhlestan) and the ring network with GIS posts of Sadafand Mirmohanna are among the priorities of the project.
4. Annual Capacity:
Not specified
5.
Total Area: 100*100 in Nakhlestan
6. Constructed Area:
2500 Square Meters
7.
Project Construction period: 2 Years
8.
Costs: 400 billion Rials
9. Access to infrastructures

NO Required infrastructure Distance to project site
1 Water on the project site
2 Power  on the project site
3 Tele-communication on the project site
4 Main Road YES
5 Airport 4.5 Kilometers
6 Harbor 12 Kilometers



10 - Investment methods

A: Partnership* B: contracting C: Absolute purchase of land D:Rent land